Buffer Time Scheduling for Work Orders in Cetec ERP
Production schedules often need to account for fixed time that is real on the floor but not really “labor.” That could be staging before a work location, cure time after a process, or a handoff delay between departments.
In Cetec ERP, the Buffer field lets you schedule that static time before or after a work location so your work order schedule reflects reality, without changing labor time, estimates, or cost.
What the Buffer Field Does
Buffer is a scheduling-only field that drives a schedule entry for a work order. It represents a fixed amount of time that occurs either before or after work is completed at a given work location. Because it is separate from labor estimates, using Buffer changes how the schedule looks and behaves, but does not change labor time, cost, or quoting assumptions.
How to Set Buffer Defaults and Overrides
You can manage Buffer in two ways. First, you can set defaults from a table in the Data Maintenance page named OrdlineStatus. Second, you can set or override Buffer inside a part’s labor plan or an order-specific labor plan, when that job needs different timing than the default.
A practical decision rule is to use the OrdlineStatus table for common, repeatable buffers that apply broadly, and use labor plan overrides when the buffer is part-specific or order-specific.
Why Buffer Matters Compared to the Old Workaround
Before Buffer, modeling schedule gaps in a traveler or router took extra steps. A common approach was to create a separate “staging” work location, place it in the labor plan, and then enter a static setup-style or outsource-style time so the scheduling system would register the gap.
That workaround made schedules possible, but it also added routing complexity and extra maintenance. Buffer reduces that overhead by letting you express the schedule delay directly at the work location where it belongs.

Key Takeaways
- Buffer schedules fixed time before or after a work location without changing labor estimates or cost.
- Set Buffer defaults in the OrdlineStatus table when the buffer applies broadly across work orders.
- Override Buffer in a part labor plan or an order-specific labor plan when timing is specific to the job.
- Buffer replaces the need to create separate staging work locations just to represent schedule gaps.
Conclusion
Scheduling accuracy depends on representing the real waiting time around production steps. Buffer gives Cetec ERP users a direct way to model that time at the work location level, keeping your schedule realistic without inflating labor time, estimates, or cost.