Skip to main content
Try for free

How To Put Parts Away

Move received parts from the receiving bin to the shelf bin they will be picked from, so Cetec sends pickers to the right place.

Updated Nov 9 2026

How To Put Parts Away

Allow external media cookies to watch this video.

Before you start

  • Put Away is under Warehouse > Receiving and needs the Warehouse role.
  • Every receipt lands in a receiving bin (named NEW, or NEW-1, NEW-2 … when NEW already holds that part) and waits on the Put Away list. Putting it away is optional but keeps bins accurate.
  • Bin names may use only A–Z, 0–9, hyphens and spaces, up to 50 characters. Cetec stores them in capitals.
  1. Find the receipt

    1. Go to Warehouse > Receiving > Put Away. The list is headed Receipts Pending Put Away, newest receipt first. It shows your default warehouse when you have one set.
    2. To find a receipt, click the filter search bar (Filter or search…), pick Prcpart, PO #, Location, Creation Date or Intercompany?, set the value, and click Apply (1).
    3. Check the row: Receipt Code, Prcpart, PO - Line, Lotcode, Put Away Qty, and where the part is meant to live (Primary Bin, Preffered Bins, spelled so on screen; scroll right to see them). A receipt received without a PO shows PO - Line -.
  2. Put the receipt away

    1. On Warehouse > Receiving > Put Away, scroll the list to the right, point at the receipt's row and click Put Away, which appears at the right-hand end of the row. (The Put Away column, with a number in it, is not the button.) The Receipt Put Away: receipt code screen opens.
    2. Check the receipt details at the top (Prcpart, Receipt, Lotcode, Primary Bin). The Current Bin row shows where the stock is now and how much.
    3. Type the shelf bin in New Bin Name. (If your company only allows preferred bins, pick it from Select Preferred Bin instead.)
    4. The quantity box in the Put Away Qty column starts at the whole receipt. To put only part of it away, type a smaller number; Cetec warns Splitting Bin! PO Traceability may be impacted. when you submit. To split it across several bins, type how many extra bins in (+ Bins), click Split, and fill in a bin and quantity on each row.
    5. Click Submit.
    6. If the bin already holds this part, Cetec asks Target Bin … already exists! Do you want to:
      • Merge puts the parts into that bin. Cetec can no longer show each receipt's cost separately, and costs are averaged.
      • Create New makes a new bin with a suffix (for example A-05-05-1).
      • Specify Different lets you type another bin; Close goes back without putting away.
    7. Cetec shows Receipt … Put Away Into Bin … (with the receipt's internal number, for example Receipt 262 for receipt code 262-102426) on the classic pending list, which has a deprecation warning. Open Warehouse > Receiving > Put Away again: the receipt is no longer on the list.