Compare job cost to estimate
Compare what a job cost against what was estimated.Updated Nov 5 2026
Who this is for
Production managers and cost accountants check what finished jobs really cost. Sales and engineering use the answer to price the next quote.
Applies to
Why it matters: a quote is only as good as the estimate behind it. Comparing actual cost with the estimate shows which jobs make money, and where the labor plan or BOM is wrong.
-
Open the job's invoice
- Find the invoice for the job in
Sales > Invoices > Invoice List, or open it from the order. For a build made for stock, the invoice is the internal one Cetec creates when the build is completed (Finish a build). - To find an internal invoice on the Invoice List, remove the
Intercompany? Excludefilter. The list hides these invoices at first. You can also open it from the order or the receipt. - Open the invoice.
- Find the invoice for the job in
-
Read the cost analysis
- On the invoice, click
Cost Analysisin the left-hand menu. If the invoice has more than one line, clickCost Analysis ({n})and pick the line. - Read the cost by type: setup, labor, overhead, outsourcing, expenses and material, and the total rolled up through any sub-assemblies. Labor is costed at the worker's own labor rate if they have one, otherwise at the rate of the work location where the time was logged. Wrong rates mean a wrong job cost.
- Click
Expand Allto see each sub-assembly and component. Job cost drilldown unavailable on a component means the material's bin was cost-adjusted by hand, or the parts came from a bin where receipts were merged. Cetec shows the cost when the material was used, but can't trace it back to the receipt. - This screen shows actual cost only. To compare it with the estimate, use the reports in Compare across jobs.
- On the invoice, click
-
Compare across jobs
- Open
Sales > Invoices > Cost Comparisonto compare each invoice's labor, overhead and material with the estimate. It uses the whole labor plan's estimate. - Open
Sales > Invoices > Labor Varianceto compare logged labor with the estimate. It also uses the whole labor plan's estimate. - Managers and supervisors can open
Production > Mgmt > Est. Vs Act. Timeto compare estimated and actual time by job. It compares each work location's estimate with the time logged there, so its estimate will not match the other two reports.
- Open
Other ways to do this
Jobs still in progress
For jobs not yet finished, Production > Orders > WIP Aging Report and WIP Material Report show what is sitting in work in progress.