Enter an Order for a Multi-level BOM - Use Build WITH TOP
Build a top-level assembly and its sub-assemblies on one work order. Choosing With Top for a sub-assembly adds its components and labor to the top-level work order instead of creating a separate sub-order.Updated Nov 9 2026
Before you start
- You need a quote for the top-level part whose BOM has sub-assemblies, with every check on the quote passing (the commit screen lists anything that blocks it).
- The commit screen shows the Sub-Assembly Orders and Internal POs to be Created table only for a multi-level quote.
- This guide uses the new quote, order and work order screens. If a screen opens in the classic version, click Use New Version at the top of it.
-
Choose With Top for the sub-assemblies
- Open the quote and click COMMIT TO ORDER in the left-hand menu, or Commit Order in the process bar at the top of the quote.
- Wait a moment for the Sub-Assembly Orders and Internal POs to be Created table to load
under any Order Notices (notices don't block the order), and find its Build? column. Each
sub-assembly row has three choices:
- Yes – a separate work order (sub-order) and internal PO for that sub-assembly.
- No – no work order; the finished sub-assembly is pulled from stock.
- With Top – no sub-order; its components and labor go on the top-level work order.
- Pick With Top on each sub-assembly to build with the top level. The row's Quantity box is locked (its text dims), because the quantity comes from the top-level BOM. To set every row at once, use the select at the bottom of the Build? column ((set default build/buy)) and pick With Top.
-
Commit the order
- On the commit screen, click Commit Order once. The button shows a spinner while Cetec creates the order.
- Cetec opens the new order (Order n.1). Sub-assemblies set to With Top create no sub-order, so the order has only the top-level line.
-
Check the components on the work order
- On the order, in the lines table, click the line number in the # column (it shows workorder view when you point at it). The work order opens. If it opens in the classic version (a PARTS tab and no Parts menu item), click Use New Version.
- In the work order's left-hand menu, click Parts (the menu switches to the Parts items), then View All Parts. The sub-assembly's own components are listed in place of the sub-assembly, with Qty Per Assy multiplied by its quantity per top: a sub-assembly used twice whose BOM has 2 of a part shows that part with Qty Per Assy 4. The sub-assembly itself isn't listed, so its item number is skipped.