How To Add BOM Charges to a BOM
Add a fixed charge (setup, tooling, NRE) to a BOM so every BOM worksheet quoted for it picks the charge up, either rolled into the BOM's cost or as its own quote line.Updated Nov 9 2026
Before you start
- The MAINT section of the part's left menu, which holds Charges, is shown only to users with the Can Edit Part function (Manager, Purchasing, Supervisor, Part Edit, Can Edit BOM or Sales by default; the Block Edit Part role removes it).
- A BOM charge is a fixed amount for the whole BOM quantity, not a per-unit amount. The worksheet divides it across the units quoted.
-
Add the charge to the BOM
- Open the BOM's part record (for example, search its part number with Global Search, the magnifier in the page header). In the left menu, click MAINT + to open the section, then click Charges.
- Scroll past Edit Misc Charges to Edit BOM Charges.
- In the empty last row, type a Name (up to 20 characters).
- Enter the Cost.
- Choose the Apply Type. A new row starts on Ignore, so change it:
- Rollup On BOM – adds the cost to the BOM worksheet's total cost. Resale stays greyed out; set the price through the worksheet's markup.
- Add Line Item – adds a separate charge line to the quote. Resale becomes editable; enter the price you charge.
- Ignore – keeps the charge on file but doesn't use it.
- Click Update / Add More. Cetec shows BOM Quote Charges updated successfully and the charge joins the table. Add each charge the same way.
-
Check the charge on the BOM worksheet
- Open a quote that has the BOM's part as a Build line (add the line first if needed), scroll to the end of the line and click its BOM Worksheet icon (a small document icon beside the line's pencil). The worksheet opens.
- In the worksheet's totals under the components, Bom Charges Total shows the rolled-up charges. NA means the worksheet has no rollup charges.
- To change a charge for this quote only, click Edit on the Bom Charges Total row. The EDIT BOM CHARGES window lists the worksheet's charges (Name, Cost, Resale, Apply type, Drop); its apply types read Ignore Cost, Roll Up on BOM and Add Line Item. Change or add a row and click Update/Add (Bom Charges successfully updated), then Close. Worksheet charges are saved back to the part when the quote is committed.
-
Transfer the charge to the quote
- On the BOM worksheet, click Transfer to Quote at the bottom of the totals.
- Rollup On BOM charges are in the cost Cetec transfers, so the line's margin applies to them; the cost is spread over the line's quantity. The quote line's hint (hover the line) says misc charges are Included (rollup). Set the worksheet's markup before you transfer, or the line's resale stays at 0.
- Add Line Item charges become one extra quote line, quantity 1, Trans Code Charge, with the cost and resale you entered. The line's part number is your non-inventory PRC (ZZZ by default) followed by the charge name, and its comment reads BOM Charge For <part> Rev <revision> (Line <n>).