How To Create a Labor Plan (Traveler)

A labor plan lists the work locations a BOM revision moves through, the operations done at each one, and their times and instructions. It prints as the traveler and drives the labor estimate.

Updated Nov 9 2026

How To Create a Labor Plan (Traveler)

Allow external media cookies to watch this video.

Before you start

  • The part must be a BOM. Each revision has its own labor plan.
  • Revisions in the part's left menu needs the Can Edit Revisions function (Manager, Doc Control or Engineer by default). Without it the item is greyed out.
  • The work locations and operations you need must already exist. Your admin keeps them in Admin > Maintenance > Data Maintenance (work locations under Ordline Status, operations under Build Operations). Each operation's standard time is set there.
  1. Open the revision's labor plan

    1. Go to Parts > Lists > Part List and click the part's number in the PrcPart column.
    2. Click Revisions in the part's left menu.
    3. On the revision's row, click Labor Plan. Check the part and revision before you edit: changing one revision's plan doesn't change the others.
  2. Add the work locations

    1. On the labor plan, choose a work location in the Search ordline status (location)... box under the table (the one beside Add, not the location box on an existing row) and click Add. Cetec shows Successfully added the location. Add the locations in the order the product moves through the shop.
    2. To add every location your admin has given a default build order, click Add All Default Locations and click OK.
    3. To change the order, drag a location row by the handle at its left.
    4. If the product has to wait before or after a location (a queue, or curing time), enter the time under Buffer, choose Pre (before the work) or Post (after it), and click Set on that row. The header shows the unit, for example Buffer (seconds).
    5. To remove a location, click the trash icon under Remove on its row and click OK. Remove All Locations clears the whole plan.
  3. Add the operations

    1. On the labor plan, click the pencil in the location's Operations column. The location opens to show its operations.
    2. Under Add Operation, choose the operation and click Add. Each operation shows its Seconds Per from its standard time.
    3. Set Times to how many times the operation is done on each unit. For example, 4 for four screws driven one at a time.
    4. Tick Setup for work done once per job whatever the quantity, such as a machine setup. Leave it unticked for work repeated on every unit. Setup time counts once in the estimate; everything else is multiplied by the build quantity.
    5. Click Set to save its Times and Setup. It's the Set at the right end of the Custom Form row just under the operation. Cetec shows Updated Operation. and the Total Seconds updates.
    6. Repeat for each operation at the location, then for each location. Use the up and down arrows to reorder operations, and the trash icon to delete one.
  4. Write the work instructions

    1. On the labor plan, open the location with the pencil in its Operations column. Each operation shows an Instruction table with a blank (new) row.
    2. Type the instruction in the (new) row. To use rich text and attachments, click Use Fancy Work Instructions at the top of the page.
    3. Tick Pick Req'd when the parts for this step must be picked before the operator can go on. The components must be assigned to this work location (Work Loc) on the revision's BOM.
    4. Set Sign Req'd to Response Required or Response Required With Password when the operator must sign off before the work moves on. Leave it at Not Required otherwise.
    5. Click Update under the instructions to save them. To delete an instruction, tick its Drop? and click Update.
  5. Check the estimate and the traveler

    1. On the labor plan, read the totals at the foot of the table: Time Est, Setup, Recurring, Labor Est, Overhead Est and Total. Labor and overhead come from each work location's rates, so a location with no rate adds time but no cost.
    2. Click Preview Work List to open the traveler in a new tab. Check the location order, operations and instructions.
  6. Set one total labor estimate

    Use this instead of a step-by-step plan when the product only needs one labor time.

    1. On the labor plan, under Total Labor Estimate, choose Use Total Labor Estimate. The minutes box is greyed out until you do.
    2. Enter the total in minutes and click Update. Cetec shows Labor Estimate Updated Successfully., the page says (labor plan not used - All revisions set to use total labor estimate), and the location boxes and buttons under the table are hidden.
    3. To use the location plan again, choose Use Location Path Estimate and click Update.