How to Create a New Revision on a Quote
Quote a new revision of a part you build: give the quote line a new revision name and work its BOM worksheet under that revision.Updated Nov 9 2026
Before you start
- Typing a new revision name needs the Can Create Revisions permission (the Manager, Doc Control, Engineer or Sales role by default; Admin always). Without it the line only lets you pick an existing revision.
- The quote line should be a Build line (one with a BOM worksheet icon).
- This guide uses the new quote screen. If the quote opens on the classic screen, click Use New Version at the top of it.
-
Give the line a new revision
- Open the quote, for example from Sales > Quotes > Quote List.
- On the line, click the pencil icon (Edit Line). The Advanced Edit window opens.
- Next to Revision, type the new revision name in the (new) box. The drop-down beside it keeps the line's current revision until you save.
- Leave Replace BOM Data? as it is (see the warning below), and click Update.
The line now shows the new revision in Rev, with a red note under it: Revision being quoted (…) is not current. Click here to update Revision and BOM Worksheet. That's expected for a new revision. Don't click here unless you want to go back: it recreates the worksheet for the part's current revision (Cetec asks you to confirm).
-
Check the BOM worksheet
- On the quote, click the line's BOM worksheet icon (BOM Worksheet). Hold Ctrl (Cmd on a Mac) while clicking to open it in a new tab.
- If the worksheet opens on the classic screen, click Use New Version at the top. Check that Revision shows the new revision.
- Add or change the components and quantities for the new revision: search a part in the empty row above the components and click Add, or use + Components for several.