Skip to main content
Try for free

How to Create a New Revision on a Quote

Quote a new revision of a part you build: give the quote line a new revision name and work its BOM worksheet under that revision.

Updated Nov 9 2026

How to Create a New Revision on a Quote

Allow external media cookies to watch this video.

Before you start

  • Typing a new revision name needs the Can Create Revisions permission (the Manager, Doc Control, Engineer or Sales role by default; Admin always). Without it the line only lets you pick an existing revision.
  • The quote line should be a Build line (one with a BOM worksheet icon).
  • This guide uses the new quote screen. If the quote opens on the classic screen, click Use New Version at the top of it.
  1. Give the line a new revision

    1. Open the quote, for example from Sales > Quotes > Quote List.
    2. On the line, click the pencil icon (Edit Line). The Advanced Edit window opens.
    3. Next to Revision, type the new revision name in the (new) box. The drop-down beside it keeps the line's current revision until you save.
    4. Leave Replace BOM Data? as it is (see the warning below), and click Update.

    The line now shows the new revision in Rev, with a red note under it: Revision being quoted (…) is not current. Click here to update Revision and BOM Worksheet. That's expected for a new revision. Don't click here unless you want to go back: it recreates the worksheet for the part's current revision (Cetec asks you to confirm).

  2. Check the BOM worksheet

    1. On the quote, click the line's BOM worksheet icon (BOM Worksheet). Hold Ctrl (Cmd on a Mac) while clicking to open it in a new tab.
    2. If the worksheet opens on the classic screen, click Use New Version at the top. Check that Revision shows the new revision.
    3. Add or change the components and quantities for the new revision: search a part in the empty row above the components and click Add, or use + Components for several.