Skip to main content
Try for free

How To Create an Order (Step 3) - Commit an Order

Turn a finished quote into an order. Cetec checks the quote first and lists anything that stops the order; once it's clean, one click creates the order (and any sub-assembly orders and POs).

Updated Nov 9 2026

How To Create an Order (Step 3) - Commit an Order

Allow external media cookies to watch this video.

Before you start

  • You need the Can Enter Orders permission (the Sales, Manager or CanEnterOrders role by default). The BlockOrderEntry role removes it.
  • The quote needs a customer and at least one open line with a quantity. Your company may also require a customer PO number, an approval or a prepayment first.
  • This guide uses the new quote screen. If the quote opens on the classic screen, click Use New Version at the top of it.
  1. Check the quote can be committed

    1. Find the quote, for example in Sales > Quotes > Quote List (search by quote number or customer), and open it.
    2. Click COMMIT TO ORDER in the left-hand menu, or Commit Order in the process bar at the top of the quote.
    3. If the screen shows Order Entry Prohibited Until All Conditions Are Met, read the reasons under it (for example Customer is on credit hold or Fields Required: PO Num). Click Edit Quote, fix them, and open COMMIT TO ORDER again. Reasons about the customer's credit (Restricted Order Entry for credit code, Customer is on credit hold) are fixed on the customer by accounting; Ignore Credit Hold in Quote Edit clears only the credit hold.
    4. Expand Order Notices (Doesn't Prohibit Order Entry) to read warnings that won't stop the order, such as dates in the past.
  2. Choose how sub-assemblies are built

    Only for a quote with multi-level BOMs. The Sub-Assembly Orders and Internal POs to be Created table lists each sub-assembly.

    1. In Build?, choose for each row:
      • Yes – build it on its own work order;
      • No – take it from stock (no sub-assembly order is made);
      • With Top – build it as part of the top-level order.
    2. Change the Rev, Prod Line, Location or dates for a row if you need to.
    3. To merge rows for the same part and revision into one sub-order, click Combine SubOrders with Same Rev and click OK on the confirmation. It uses the revisions on the BOM worksheet, not any Rev you changed in this table, so change revisions on the worksheet first.
  3. Commit the order

    1. On the commit screen, set the options next to the button if you need them:
      • Create Separate Order For Each Quote Line?
      • Put all lines into batch?
      • Do this in the background? (if your company has set this up; Cetec emails you when it's done)
    2. For a drop-ship quote, pick the vendor under DropShip. For an order to your own company, set the internal vendor (Intercompany Order, Set Internal Vendor) and the Receiving Location.
    3. Click Commit Order. Cetec creates the order and opens it (Created Order followed by the order number, plus any sub-orders and POs it created).

    The quote's left-hand menu now lists the order under ORDERS (and any SUB ORDERS and internal POs), and the order links back with QUOTE followed by the quote number.