Skip to main content
Try for free

How To Create an Order

Every order in Cetec starts as a quote (also called a quote / order worksheet). You create the quote, fill in the header, add the lines, and then commit the quote to an order.

Updated Nov 9 2026

How To Create an Order

Allow external media cookies to watch this video.

Before you start

  • You need the Can Create Quotes permission (the Sales, Manager or Can Create Quotes role by default; Admin always). The BlockQuoteEntry and Production Only roles remove it, and without it the Quote List has no Create button.
  • Committing needs the Can Enter Orders permission (Sales, Manager or CanEnterOrders by default). The BlockOrderEntry role removes it.
  • This guide uses the new quote screen. If a quote opens on the classic screen, click Use New Version at the top of it. Cetec remembers your choice for every quote after that.
  1. Start the quote

    1. Go to Sales > Quotes > Quote List.
    2. Click Create.
    3. Pick the Customer. Fill in anything else you already know, such as Cust PO #, Name (an internal name for the quote) or Project. Owner defaults to you.
    4. Click Create. Cetec creates the quote and opens it.
  2. Fill in the quote header

    1. On the quote, click the pencil icon at the top right of the header. The Quote Edit window opens.
    2. Check the Customer (required) and pick the Buyer. The Buyer list shows the customer's contacts; if it says No options, click (Create) next to Buyer to add one.
    3. Type the customer's PO number in Cust PO #. It's required only when your company requires a PO on every order; the label then shows a red asterisk.
    4. Check the other details Cetec filled in from the customer, such as Order Type, Terms and the shipping fields.
    5. Click Submit.
  3. Add the quote lines

    1. On the quote, use the empty row at the bottom of the lines: search for the part in the Part column, then enter the quantity, the dates, Cost and Resale, and click Add at the right end of the row (scroll right if you can't see it). Wait for Quote Line Created Successfully; if the line doesn't appear, click Add again.
      • For more fields, click Add Line above the lines instead. Fill in the ADD LINE window and click Ok (or Ok & Add to keep adding lines).
      • To have Cetec work out the work start date, leave Work Start Date blank and set the Ship Date and quantity.
      • The i icon next to Unit Cost and Unit Resale in the ADD LINE window links to how Cetec defaults cost and resale.
    2. To set the trans code, click the line's pencil icon (Edit Line). In the Advanced Edit window, set Trans Code to Stock, Build or Charge and click Update.
    3. To remove lines, tick their Delete box, click Delete below the lines and confirm.
  4. Commit the quote to an order

    1. On the quote, click COMMIT TO ORDER in the left-hand menu (or Commit Order in the process bar at the top of the quote).
    2. If the screen shows Order Entry Prohibited Until All Conditions Are Met, read the reasons listed under it, click Edit Quote, fix them and come back. Some reasons come from the customer record, not the quote: Restricted Order Entry for credit code and Customer is on credit hold need accounting to change the customer's credit code or release the hold. Ticking Ignore Credit Hold in Quote Edit clears only the credit-hold reason.
    3. If the order has sub-assemblies, the Sub-Assembly Orders and Internal POs to be Created table lists them. In Build?, choose Yes to build a sub-assembly on its own work order, No to pull it from stock, or With Top to build it as part of the top-level order.
    4. Click Commit Order. Cetec creates the order and opens it (Created Order followed by the order number).

    The order's left-hand menu has a QUOTE link back to the quote it came from.