How To Drag And Drop Schedule Segments

Fine-tune a scheduled work order by moving its time segments (one block per operation and work location) to the times you want, either on the work order's own schedule or on the Planning Gantt Chart.

Updated Nov 9 2026

How To Drag And Drop Schedule Segments

Allow external media cookies to watch this video.

Before you start

  • Planning Gantt Chart is under Production > Scheduling and needs the Manager or Supervisor role.
  • Moving segments on a work order's schedule needs the Can Edit Order WIP Date function (Manager or Order WIP Modify by default). Without it Cetec shows "You do not have permission to modify work start date for orders."
  • The order line must already be scheduled, and your work locations need base capacities. Without them the Planning Gantt Chart shows "Alert! Ordline Status locations don't have capacity defined. No Schedule Data Possible."
  • These steps use the new Work view. If your work order opens in the classic view, click Use New Version at the top of it; Cetec remembers the choice for you.
  1. Find the order on the Planning Gantt Chart

    1. Go to Production > Scheduling > Planning Gantt Chart. The page is titled Production Scheduling Gantt Chart.
    2. Type the order number in Order (and the line number in Line Item if you want one line). The chart redraws as you type. The Date range runs from today to one week from today; change it to see segments before today or further ahead.
    3. Click View By Order, View By Production Line or View By Location to change how rows are grouped. Click Zoom to Fit to fit everything on screen, or scroll over the chart to zoom.
    4. Hover over a segment to see its details. Check that the operations run in the order your process needs. (Clicking the order number on a row opens the order's schedule in a pop-up window.)
  2. Move segments on the work order's schedule

    1. Open the work order (for example from Production > Orders > Production Order List, click the number in the Order column).
    2. Click Schedule in the work order's left-hand menu. Schedule is shown for scheduled build orders. (If your company uses the alternative Work view menu, Schedule is a tab under Work instead.)
    3. In Schedule Entries, check each segment's Est. Work Time, Work Location, Work Start and Work Stop. Total Est and Remaining Est are shown above the table.
    4. Move a segment in either of these ways:
      • In the Gantt Chart at the top of the page, click the segment to select it (it turns yellow and a red ✗ appears next to it), then drag it to its new time. Cetec saves it and shows "Schedule Entry Updated". Dragging a segment you haven't selected scrolls the chart instead.
      • In the Schedule Entries table, change the segment's Work Start and Work Stop, then click Set on that row.
    5. To move several segments together, hold Ctrl (Cmd on a Mac) and click each segment on the Gantt Chart, then drag one of them. Cetec moves them all and shows "Schedule Entries Updated".
    6. When a segment's work is done, tick Complete ? on its row and click Set. The row turns green and Remaining Est goes down.
    7. If a later operation can overlap an earlier one (for example its setup can start while the first operation is still running), drag it so it starts before the earlier one finishes, then move the operations after it so they start when it ends.
  3. Move segments on the Planning Gantt Chart

    1. Go to Production > Scheduling > Planning Gantt Chart and type the order number in Order.
    2. Click a segment to select it (it turns black, with a red ✗ next to it), then drag it to its new time. Cetec saves it when you let go. To move several at once, hold Ctrl (Cmd on a Mac), click each one, then drag.
    3. Look at the result on the chart, or open the work order's Schedule page to see the new Work Start and Work Stop times.