Track tooling
Know what tools the shop has, where they are, and whether they are fit for use.Updated Nov 5 2026
Who this is for
Production leads and quality technicians keep a register of the shop's tools, fixtures and gauges, and record their maintenance and calibration. Operators check a tool is in date before they use it.
Applies to
Why it matters: a gauge out of calibration can pass bad parts, and an auditor will ask for the record that shows every tool used on a job was in date.
-
Add the tool to the register
- Open
Production > Tools > Tool Listand clickAdd New Tool. - Fill in the tool's
Type,Description,Manufacturer,Model,SerialnumandAsset Owner, and where it lives:Work LocationandBox or Bin. Every tool needs a serial number; without one Cetec shows Serial required! - Set the
Next Maint/Cal Date, and theMaintained By (Vendor)if an outside lab calibrates it. - Click
Submit. Cetec opens the new tool's edit screen. - Under Maintenance Schedule, pick the
Maint TypeandMaint Frequencyand clickAdd. Without a schedule the tool never shows on the maintenance list. To add a maintenance type, useADD/EDITon the Add Tool form.
- Open
-
Find tools due for maintenance
- Open
Production > Tools > Tool Maintenance. - Check
Next Maint. DateandMaint. Frequencyfor each tool, and pick the ones due.
- Open
-
Record the maintenance
- On the
Tool Maintenancelist, clickPerform Maint.for the tool. Or open the tool and clickPerform Maint.in its left-hand menu. - Fill in the
Maintenance Type,Maintenance Date, whether theMaintenance Passed, and anyMaintenance Notes. A failed maintenance is recorded, but the schedule's next date doesn't move on. The tool stays due until it passes. - Click
Submit. Cetec shows Maintenance Data Recorded - New Maintenance Date is {date}, the next date worked out from the schedule. A tool with no schedule gets no next date: Cetec says the new date is unspecified and clears it.
- On the
Other ways to do this
Lend a tool out and back
The shop tracks who has each tool, and which order it is used on. This needs the Manager or Tools role.
- Open the tool and click
Check In/Outin its left-hand menu. - To check it out, pick who has it in
Check Out.Check Outis required. - If it is used on a job, pick the order line in
Order. The box only offers existing order lines. - Click
Checkout Tool. Cetec shows Tool checked out successfully. - When it comes back, pick
Check In By, choose where it goes inPut Away To, and clickPut Tool Away. Cetec shows Tool checked in successfully.