Skip to main content
Try for free

Change a purchase order

Adjust an open purchase when demand or supply changes.

Updated Nov 5 2026

Who this is for

Buyers change POs when a vendor's date moves, demand changes, or a price is corrected. Receiving and Accounting work from the changed PO.

Applies to
Purchasing

Why it matters: the PO is what receiving checks deliveries against and what the vendor's bill is matched to. A PO that no longer matches reality means receipts refused at the dock and bills that won't match.

  1. What is changing on the PO

    1. Know what changes: a dock date, a quantity, a price, or something in the header.
    2. If the whole line or PO is cancelled, or nothing more is coming, you will delete or close instead of editing. Both are the last items under Edit the PO.
  2. Find the PO

    1. Open Purchasing > POs > Purchase Order List. The screen is headed Purchase Orders.
    2. Click Filters, search by PO number, vendor, part or order, and click Apply. On the older list, search and click Submit.
    3. Click the PO number.
  3. Check what has already been received

    1. On the PO, check each line's Qty Recvd.
    2. Remember the quantity you edit is what is still open, not the original order.
    3. If the PO is closed, click Reopen PO first. A closed PO can't be edited.
  4. Edit the PO

    1. Open the PO and click Edit in its left-hand menu.
    2. Change the header fields and click Update Header.
    3. Change each line's Dock Date, Quantity Open or Cost and click Update Lines. Cetec says PO Line Updated successfully. The header and the lines save separately, so click the button for each part you changed. On the older Edit screen one Update saves both.
    4. Cetec keeps the first dock date as Orig Dock Date, so you can see how far a line has moved.
    5. If you changed the vendor or a part, check the G/L account on each line. Cetec reminds you.
    6. To cancel lines or the whole PO, use Delete Line/All. Any voucher lines tied to them are deleted too, though the screen doesn't warn you. Check with Accounting first if the vendor has already billed.
    7. When nothing more is coming, use Close PO and confirm Are you sure you want to close the PO?. History shows the PO's workflow steps, not its edits.
  5. Tell the vendor

    1. Open the PO, click PDF/Email in its left-hand menu (PDF/Export on the older screen), then Email PO.
    2. Fill in From and To, and click Send.
    3. If you trade by EDI, use Send 860 instead.