How To Create a Work Order Using MRP - Build
MRP - Build lists the assemblies and sub-assemblies you're short of. Pick the ones to build, put them on a quote / order worksheet for your internal account, and commit it to create the work order.Updated Nov 9 2026
Before you start
- MRP is under Purchasing and needs the Purchasing or PurchasingOnly role.
- Creating the worksheet also needs permission to create quotes.
- You need an internal customer account (the account work orders are written to).
-
Open MRP - Build
- Go to Purchasing > MRP > MRP - Build. The MRP Requirements screen opens with the BOMs filter set to Only and Or build selected.
- If the classic MRP screen opens, click Use New Version. Cetec remembers the choice for your user.
-
Refresh MRP
- Next to Refresh, choose Standard Mode (the default) or Lite Mode.
- Optional: tick Include Forecasts In Next Allocation Run?. This is a company-wide setting.
- Click Refresh. While it runs the screen shows Refresh in Progress (or the message Report refresh is in progress, Please Retry later.); the list reloads when it finishes.
-
Check supply and demand
- If the extra filters aren't showing, click More Options.
- Set Expand All Part Info? to Waterfall Only and click Submit. Each part's waterfall (supply and demand over time) shows under its row.
- Check Sum Req'd Qty on each row: the quantity MRP thinks you need to build. It's a box near the right end of the row, so scroll right to reach it.
-
Put the parts on a work order worksheet
- Tick the parts to build, or tick the box beside All? at the top of the list to select every part. To build a different quantity, change the row's Sum Req'd Qty before you add it.
- Under Build:
- leave (Leave Blank to Create a New Quote) and check the internal customer in the customer box (Cetec fills in your internal account) to start a new worksheet; or
- pick an existing quote to add the parts to it.
- Click Add/Create Quote/Order Wksht. Cetec shows Quote … created/updated. and opens the quote.
-
Commit the work order
- On the quote, click Commit Order in the step bar at the top (or Commit to Order in the left-hand menu).
- Check the quote and click Commit Order. Any Order Notices listed above the lines don't stop the commit. Cetec creates the work order and opens it (for example Order 156.1), with the step bar on Pick Parts/Material.