How To Create a Receiving Inspection
Record how many received parts passed and failed inspection as you receive a purchase order line. Cetec saves the result as an inspection linked to the receipt, and opens an NCR for any rejects.Updated Nov 9 2026
Before you start
- Receiving needs the Can Receive Stock permission.
- The purchase order line must be open. A drop-ship line has no Receive link.
- Inspection results can only be typed when you receive one line at a time. Multi-Line Receipts don't allow inspections.
-
Receive the line with inspection results
- Open the purchase order.
- Click Receive in the bar at the top of the PO to receive any open line, or click Receive under the line's Status to go straight to that line. The Receive Parts screen opens with the PO filled in.
- Fill in the receiving details for the line as usual (Quantity, Location, Lot Code and so on). There's no bin box: Cetec puts the parts in a bin for you.
- In the Inspection Info section, read the part's Inspection Instructions.
- Type how many parts passed in Qty Accepted and how many failed in Qty Rejected. Together they shouldn't be more than you are receiving. If they are, Cetec shows a warning when you leave the box, but it doesn't stop you receiving, so correct the numbers before you go on.
- Add anything worth recording in Inspection Notes.
- Click Receive.
-
Open the inspection and the NCR
- After you click Receive on the Receive Parts screen, Cetec shows Part … Received! with links: PO Line Receipt number, Receipt Label, Serial Labels, Inspection number and, if parts were rejected, NCR number.
- Click Inspection number to open the Edit Incoming Inspection screen. Its header links to the PO, the Receipt and the Part, and shows the Vendor. The NCR link is at the bottom, next to Submit.
- To change the result, type Final Qty Accepted and Final Qty Rejected, add Comments, set Status, and click Submit. Cetec shows Incoming Inspection updated. Once the inspection is Closed the quantities are read-only; click Edit at the bottom to change them again.
- Click the NCR number to open the NCR. It opens on the classic NCR page (click Use New Version for the newer one). Cetec fills in the part, the rejected quantity, the PO and the vendor, and puts your inspection notes under Details. Its Source row links back to the inspection.