How To Manage an Open PQuote or PO
Change an open purchase quote (PQuote): its header, its lines, the PDF you send the vendor. Then turn it into a PO and receive the PO's lines as the parts arrive.Updated Nov 9 2026
Before you start
- Purchasing > PQuotes > PQuote List is shown to users with the Purchasing, PurchasingOnly or AllPQuotes role. Opening a PQuote needs the Can Access The PQuote Module function (Admin, Manager, Purchasing or AllPQuotes by default).
- Placing the PO needs the Can Edit PO function (Manager or Purchasing role by default).
- Warehouse > Receiving > Receive Parts is shown to users with the Warehouse role.
- This guide describes the new PQuote screen. If a PQuote opens on the classic screen, click Use New Version at the top; Cetec remembers the choice for your user.
-
Open the PQuote
- Go to Purchasing > PQuotes > PQuote List. The list runs as soon as it opens, with the chips Status is Open and View By is PQuote.
- To narrow it, click the filter search bar (Filter or search…), choose a filter such as PQuote #, Vendor or Prcpart, set the value and click Apply (n).
- In the PQuote # column, click the number. The PQuote opens on View & Edit, headed PQuote / PO Worksheet and the number.
-
Edit the header
- On the PQuote, click the pencil above the header. The PQuote n - Edit Header Information window opens with all the header fields: Vendor, Location, Contact, Ship Via, Terms, comments and so on.
- Wait a moment for the saved values to load (the boxes can show N/A or All at first). Picking a new Vendor fills in its Ship Via and Terms; check them.
- Change what you need and click Ok. Cetec shows PQuote updated.
-
Edit a line
- On the PQuote, click the line's pencil (Edit) in the Actions column at the right-hand end of the line (scroll right if you can't see it). The Edit Line n window opens.
- Change Qty, Unit Cost, the dates or any other field. Click More Options for the rest, such as Comment, Comment 2, Manufacturer Part and Cost Center.
- Click Ok. Cetec shows Line updated.
-
Add a line
- On the PQuote, go to the empty row at the bottom of the lines table.
- Enter the Qty, search for the part and pick it, and check the Dock Date and Cost. The cost shows $0.0000 until Cetec fetches the part's price.
- Once the cost has filled in, click Add at the end of the row (scroll right if you can't see it). Cetec shows Line added.
-
Delete lines
- On the PQuote, click the red X (Delete) in the Actions column of each line you want to remove. The first time, Cetec tells you To delete this line and any others you choose, click the Delete button at the bottom right. The lines you pick are marked.
- Click Delete at the bottom right of the lines table. Cetec shows Deleted n PQuote Lines.
-
Send the PQuote to the vendor
- For a quick PDF, click (Quick) next to PDF/Email in the left-hand menu. The PDF opens with your last column settings.
- To choose what the PDF shows, click PDF/Email, tick the columns and click Set Columns. Then click Download PDF or Email PDF.
- To attach other files to the email, first add them to the PQuote: in the left-hand menu click Utilities, then Documents (n), and upload them. They then appear under Attach Extra Documents on the Email PDF screen; tick the ones to send.
- On Email PDF, pick or type the vendor contact in To Email (press Enter after a typed address), check the Subject and Body, and click Send. Cetec shows Email Sent Successfully.
-
Convert the PQuote to a PO
- On the PQuote, click Convert to PO in the left-hand menu.
- If the screen shows PO CONVERSION PROHIBITED UNTIL ALL CONDITIONS ARE MET, fix each reason it lists (for example No Vendor, No Location or No Open Lines) and come back.
- Click Place Purchase Order. Cetec creates the PO, closes the PQuote and opens the PO. If your company approves POs, the PO shows Pending Approval until it is approved.
-
Receive the PO lines
- On the PO, click Receive under the line's Status to receive that line, or Receive in the bar at the top of the PO for any open line. You can also go to Warehouse > Receiving > Receive Parts and enter the PO. The Receive Parts screen opens with the PO (and line) filled in.
- Fill in the receiving details: Quantity, Location, Lot Code and anything else your company records.
- To record an inspection, type Qty Accepted and Qty Rejected under Inspection Info. If you reject any parts, Cetec opens an NCR (non-conformance report) for them.
- Click Receive. Cetec shows the part as received, with links to the PO Line Receipt, the Receipt Label, and the Inspection and NCR if there are any. To receive another line of the same PO next, click Receive & Keep PO instead: the PO stays filled in.
The PO stays open until every line is received. To stop waiting for the rest, click CLOSE PO in the PO's left-hand menu.