Inspect a receipt
Check delivered material against what was ordered.Updated Nov 5 2026
Who this is for
Receiving inspectors check deliveries before the parts are used. Quality follows up on anything that fails, and buyers take failed parts up with the vendor.
Why it matters: a bad part that gets into stock is found later, on the shop floor or at the customer, when it costs far more. Inspection records also build each vendor's quality history.
-
Read the inspection instructions
- On
Warehouse > Receiving > Receive Parts, type the PO number inPO or RMA ID, click the PO in the suggestions, and pick the line. The part's instructions show under Inspection Instructions. - Check the parts against the instructions, the PO and the packing slip.
- On
-
Record the result at receipt
- On the Receive Parts screen, find the Inspection Info section for the line.
- Type how many passed in
Qty Acceptedand how many failed inQty Rejected. Together they must not add up to more than you are receiving. Cetec warns you when you clickReceiveif they do. Fix the numbers before you receive. - Add anything worth recording in
Inspection Notes. - Click
Receive. - Cetec saves the inspection with the receipt and links it after the receipt is saved. If any parts were rejected, it also creates an NCR and links it.
-
Deal with the rejected parts
- On the Receive Parts screen, click the
NCRlink Cetec shows after the receipt is saved. Or open the inspection fromWarehouse > Receiving > Incoming Inspectionsand click the NCR under NCR. - Record what is wrong on the NCR, and decide what happens to the parts. That is Disposition a defect. If the NCR shows No Edit Permissions For This NCR!, Quality owns it from here; tell them the NCR number.
- To send the parts back, open the inspection and click
Create Vendor Return. That is Return material to a vendor.
- On the Receive Parts screen, click the
Other ways to do this
Inspect later, from the inspection queue
Parts are received first and inspected afterwards, usually because your company holds every receipt until it is inspected. While an inspection is pending, its bins are locked and the receipt can't be put away. Trying shows Can not put away. Bin locked/Inspection pending.
- Open
Warehouse > Receiving > Incoming Inspections. ClickFilters, setStatustoPending(receipts held for inspection) orOpen(results not final), remove theDate Inspected Fromdate so older receipts show, and clickApply. - Click the inspection to open it, and read Incoming Inspection Instruction on Part.
- Type
Final Qty Accepted,Final Qty Rejectedand anyComments. Do this before you change the status: closing locks the quantities. - Set
StatustoClosed, and setBin Lock/UnlocktoUnlock Allso the parts can be put away and used. - Click
Submit. Cetec shows Incoming Inspection updated. - If any parts failed, continue at Deal with the rejected parts.
Use Old Version opens the older screen, where the same fields are Qty Accepted,
Qty Failed, Status and Bin Lock/Unlock, and the button is Update (Updated
Inspection).