Skip to main content
Try for free

Inspect a receipt

Check delivered material against what was ordered.

Updated Nov 5 2026

Who this is for

Receiving inspectors check deliveries before the parts are used. Quality follows up on anything that fails, and buyers take failed parts up with the vendor.

Applies to
Inventory
Quality

Why it matters: a bad part that gets into stock is found later, on the shop floor or at the customer, when it costs far more. Inspection records also build each vendor's quality history.

  1. Read the inspection instructions

    1. On Warehouse > Receiving > Receive Parts, type the PO number in PO or RMA ID, click the PO in the suggestions, and pick the line. The part's instructions show under Inspection Instructions.
    2. Check the parts against the instructions, the PO and the packing slip.
  2. Record the result at receipt

    1. On the Receive Parts screen, find the Inspection Info section for the line.
    2. Type how many passed in Qty Accepted and how many failed in Qty Rejected. Together they must not add up to more than you are receiving. Cetec warns you when you click Receive if they do. Fix the numbers before you receive.
    3. Add anything worth recording in Inspection Notes.
    4. Click Receive.
    5. Cetec saves the inspection with the receipt and links it after the receipt is saved. If any parts were rejected, it also creates an NCR and links it.
  3. Deal with the rejected parts

    1. On the Receive Parts screen, click the NCR link Cetec shows after the receipt is saved. Or open the inspection from Warehouse > Receiving > Incoming Inspections and click the NCR under NCR.
    2. Record what is wrong on the NCR, and decide what happens to the parts. That is Disposition a defect. If the NCR shows No Edit Permissions For This NCR!, Quality owns it from here; tell them the NCR number.
    3. To send the parts back, open the inspection and click Create Vendor Return. That is Return material to a vendor.

Other ways to do this

Inspect later, from the inspection queue

Parts are received first and inspected afterwards, usually because your company holds every receipt until it is inspected. While an inspection is pending, its bins are locked and the receipt can't be put away. Trying shows Can not put away. Bin locked/Inspection pending.

  1. Open Warehouse > Receiving > Incoming Inspections. Click Filters, set Status to Pending (receipts held for inspection) or Open (results not final), remove the Date Inspected From date so older receipts show, and click Apply.
  2. Click the inspection to open it, and read Incoming Inspection Instruction on Part.
  3. Type Final Qty Accepted, Final Qty Rejected and any Comments. Do this before you change the status: closing locks the quantities.
  4. Set Status to Closed, and set Bin Lock/Unlock to Unlock All so the parts can be put away and used.
  5. Click Submit. Cetec shows Incoming Inspection updated.
  6. If any parts failed, continue at Deal with the rejected parts.

Use Old Version opens the older screen, where the same fields are Qty Accepted, Qty Failed, Status and Bin Lock/Unlock, and the button is Update (Updated Inspection).