Skip to main content
Try for free

Disposition a defect

Decide what to do with material that failed.

Updated Nov 5 2026

Who this is for

Quality engineers run nonconformance reports (NCRs): they record what is wrong, contain it, and decide what happens to the material. Production reworks or scraps it, and buyers send it back to the vendor.

Applies to
Quality
Production
Purchasing

Why it matters: rejected material that isn't dispositioned sits in limbo, or gets used by mistake. The NCR is the record auditors and customers ask for when something goes wrong.

  1. Open the NCR

    1. Most NCRs open themselves. Cetec creates one when parts are rejected at receiving (Inspect a receipt) or fail an in-process inspection (Inspect product). On the work order's INSPECTIONS list, scroll right to the NCR column and click the NCR's number (for example NCR 13). Rows without an NCR show Create NCR there instead.
    2. To start one by hand, open Production > Quality > NCR List and click Create NCR. Pick the NCR Type. The first type is already chosen. Click Create, and Cetec opens the new NCR.
  2. Record the problem and contain it

    1. On the NCR, check the NCR Type and type a Title.
    2. Pick the part in Prcpart and type its quantity. Fill in the Work Location, Vendor and PO that apply. The order and customer show at the top of an NCR that came from an order.
    3. Describe what is wrong in Non-Conformance Details.
    4. Under Containment, record where else the problem could be and what you have quarantined.
    5. Tick Critical? if everyone should see it flagged.
    6. Click Update. Cetec shows NCR Updated!
  3. Decide what happens to the material

    1. Click the workflow control at the top right. It shows the NCR's stage and who has it, for example Creation: followed by a name.
    2. Pick the reviewer and click Send To Review. Your admin sets who can be assigned at each stage with Edit Assignments.
    3. In the Review section, set the Disposition: Rework, Return To Vendor, Use As Is, Scrap or Return To Stock. Each stage's fields appear when the NCR reaches that stage, and earlier stages' fields become read-only.
    4. Add Review Comments explaining the decision, and click Update.
    5. To send the parts back to the vendor, use the NCR's vendor return. See Return material to a vendor.
  4. Close out the NCR

    1. With the workflow control, click Send To MRB.
    2. Under Closeout, record the Cost Impact, Cost Recovered, whether the parts were Reinspected (and the Reinspection Report Num.), and any Customer Authorize reference.
    3. Pick the Resolution. If the cause needs fixing, type a CAR's number or title in the CAR box, or pick a CAR type to create one. See Correct a root cause.
    4. Click Update, then close the success message. It covers the workflow control.
    5. Open the workflow control and click Close. The control shows Closed.