Inspect product
Check product during and after the build.Updated Nov 5 2026
Who this is for
Inspectors and operators check product during the build (in-process) and when it is finished (final), and record the result on the work order. Quality follows up on anything that fails.
Applies to
Why it matters: an inspection record proves each unit was checked before it shipped. The failure codes recorded here are what quality reports and corrective actions are built on.
-
Open the work order's inspections
- Open
Production > Orders > Production Order Listand click the work order's number. Page through the list if it isn't on the first page. - Click
INSPECTIONSin the work order's left-hand menu.
- Open
-
Record the inspection
- On the work order's Inspections screen, pick the
Inspection Type: In Process for a check during the build, Final for the finished product. Source/Receiving is for incoming material. - Type the
Qty Inspected,Qty AcceptedandQty Rejected. SetPassto 1st for the first inspection of this product, 2nd for a reinspection, and so on. Record the earlier pass before a later one. - Fill in the
Date CodeandAssembler. Both are required, like every field marked*. - Pick the
Inspector(type part of the name, then choose it), and check theProduction LineandWork Location.Work Locationstarts at the order's current location, so change it to where you inspected. Add anyComments. - Click
Create. If nothing was rejected, Cetec shows Inspection Added.
- On the work order's Inspections screen, pick the
-
Record each failure
- If any parts were rejected, Cetec opens Set Failure Details straight after
Create. For each failure, pick the code underFailure. Every failure needs a code. The codes are grouped by stage: for example, in-process codes start with I and final codes with F. Fill in theComponent #,Component Prcpart,SerialandReference Designator. - To record the failure without creating an NCR, tick
Skip NCR?. It shows only if your company allows it. If there is noSkip NCR?, it is switched off. - Click
Update. Cetec shows Inspection Added & NCR Created and lists the inspection with its NCR number in theNCRcolumn. Work the NCR as in Disposition a defect.
- If any parts were rejected, Cetec opens Set Failure Details straight after
Other ways to do this
Record a quick pass
The product passed and there is nothing else to record.
- On the work order, open the
ORDER INFOtab and clickadd quick passnext to theInspectionscount. - In Add Quick Inspection, set the
Typeand theLocation, then clickRecord Passed Inspection.Typestarts at Source/Receiving, so change it for an in-process or final check. - Cetec shows no message. Check that the inspection count went up by one.