Skip to main content
Try for free

Inspect product

Check product during and after the build.

Updated Nov 5 2026

Who this is for

Inspectors and operators check product during the build (in-process) and when it is finished (final), and record the result on the work order. Quality follows up on anything that fails.

Applies to
Quality
Production

Why it matters: an inspection record proves each unit was checked before it shipped. The failure codes recorded here are what quality reports and corrective actions are built on.

  1. Open the work order's inspections

    1. Open Production > Orders > Production Order List and click the work order's number. Page through the list if it isn't on the first page.
    2. Click INSPECTIONS in the work order's left-hand menu.
  2. Record the inspection

    1. On the work order's Inspections screen, pick the Inspection Type: In Process for a check during the build, Final for the finished product. Source/Receiving is for incoming material.
    2. Type the Qty Inspected, Qty Accepted and Qty Rejected. Set Pass to 1st for the first inspection of this product, 2nd for a reinspection, and so on. Record the earlier pass before a later one.
    3. Fill in the Date Code and Assembler. Both are required, like every field marked *.
    4. Pick the Inspector (type part of the name, then choose it), and check the Production Line and Work Location. Work Location starts at the order's current location, so change it to where you inspected. Add any Comments.
    5. Click Create. If nothing was rejected, Cetec shows Inspection Added.
  3. Record each failure

    1. If any parts were rejected, Cetec opens Set Failure Details straight after Create. For each failure, pick the code under Failure. Every failure needs a code. The codes are grouped by stage: for example, in-process codes start with I and final codes with F. Fill in the Component #, Component Prcpart, Serial and Reference Designator.
    2. To record the failure without creating an NCR, tick Skip NCR?. It shows only if your company allows it. If there is no Skip NCR?, it is switched off.
    3. Click Update. Cetec shows Inspection Added & NCR Created and lists the inspection with its NCR number in the NCR column. Work the NCR as in Disposition a defect.

Other ways to do this

Record a quick pass

The product passed and there is nothing else to record.

  1. On the work order, open the ORDER INFO tab and click add quick pass next to the Inspections count.
  2. In Add Quick Inspection, set the Type and the Location, then click Record Passed Inspection. Type starts at Source/Receiving, so change it for an in-process or final check.
  3. Cetec shows no message. Check that the inspection count went up by one.