How To Create a PO (Purchase Order)
Every purchase order in Cetec starts as a PQuote (purchase quote / PO worksheet). Create the PQuote, add the vendor and lines, optionally send it to the vendor as a quote request, then convert it to a PO and send the PO.Updated Nov 9 2026
Before you start
- PQuote List is under Purchasing > PQuotes and needs the Purchasing, PurchasingOnly or AllPQuotes role. Creating a PQuote needs the Can Create PQuotes function (the same roles by default).
- Placing the PO needs the Can Edit PO function (Manager or Purchasing role by default). Without it, submit the PQuote for approval instead.
- The vendor must exist and not be on hold.
-
Start a PQuote
- Go to Purchasing > PQuotes > PQuote List.
- Click Create at the top of the list. Cetec creates a PQuote and opens it on the new PQuote screen.
-
Set the vendor and location
- On the PQuote, click the pencil above the header. The Edit Header Information window opens.
- In Vendor, type the vendor's name and pick it from the results. Check Location (the warehouse that receives the goods). Both are required to place the PO.
- Fill in anything else you need, such as Contact, Ship Via, Terms, Cost Center or PO Comment (shows on the PO PDF).
- Click Ok. Cetec shows PQuote updated.
-
Add the lines
- On the PQuote, go to the empty row at the bottom of the lines table.
- Enter the Qty, search for the part and pick it, and check the Dock Date and Cost. Cetec fills in the cost from the vendor's price breaks or the last price paid; type over it only if the price is different.
- Click Add at the end of the row. Repeat for each part. The row is wide, so you may need to scroll right to reach Add.
- To add the other dates, click the pencil (Edit) on the line and set Dock Date, Requested Arrival Date and Promised Ship Date, then click Ok. Filling in the dates, especially the dock date, keeps MRP and allocations accurate.
-
Send the PQuote to the vendor
Do this if you want the vendor to confirm prices before you order; otherwise go straight to Convert the PQuote to a PO.
- On the PQuote, click PDF/Email in the left-hand menu. ((Quick) next to it opens the PDF straight away.)
- Tick the columns to show on the PDF and click Set Columns. The preview updates.
- Click Download PDF to save it, or Email PDF to send it.
- On the Email PDF screen, check From Email. In To Email, pick a vendor contact or type an address and press Enter to add it (the box takes several addresses). Add CC or BCC the same way if needed, tick any documents under Attach Extra Documents, edit the Subject and Body, and click Send. Cetec shows Email Sent Successfully.
-
Convert the PQuote to a PO
- On the PQuote, click Convert to PO in the left-hand menu.
- If the screen shows PO CONVERSION PROHIBITED UNTIL ALL CONDITIONS ARE MET, fix each listed reason on the PQuote (for example No Vendor, No Location, No Open Lines, Not Approved or Vendor Is On Hold) and come back.
- Click Place Purchase Order. Cetec creates the PO and opens it. Stopping before this click leaves you with no PO.
-
Send the PO to the vendor
Placing the PO doesn't send it.
- On the new PO, click PDF/Email in the left-hand menu.
- Click Email PO. The email form opens on the classic screen. Check From and To. Cetec fills in To with the PO contact's email, or the vendor's email if the PO has no contact. Add more addresses separated by commas, or pick one from (Contacts) under it. Click Send. Cetec shows PDF sent and marks the PO as emailed.
- To send the file yourself instead, click Download PDF.