Get a quote approved
Move a quote through its review stages and get it into a state that can be committed.Updated Nov 5 2026
You arrive here from Quote a job, at Check it can convert, when your business routes quotes through review before they go out.
Who this is for
Sales reps send quotes into review. Sales managers, engineers and buyers review them: margin, cost, and whether the material can be had.
Not every company reviews quotes in Cetec. Some approve by email, by phone, or on paper, and some do not approve quotes at all. Every quote still starts in the first workflow stage and stays there if nobody moves it. That only blocks the order if your admin has made approval required before a quote can commit. This page is for companies that run the review in Cetec.
Why it matters: review is where a price gets checked before it is promised. A quote sitting in someone's queue is a customer waiting for an answer, and where your company requires approval, a quote that never reaches it cannot become an order.
-
Who needs to review this
- Work out which reviews this quote actually needs. Engineering review for anything with a BOM or a custom build behind it. Purchasing review where material has to be bought specifically for the job.
- Identify the person at each stage, not just the department. Transitions are assigned to a named user, and the assignee list shows every user, not who handles which stage. Ask your manager who reviews each stage.
- Ask your admin whether your instance requires a formal approval state before the quote can be committed (the Quote - Require Approval Workflow State config), and which state counts as approved. You cannot see that setting yourself.
- Learn your instance's states. Every new quote starts in the workflow automatically, in the initial state. The states Cetec ships with are
Sales Editing(the initial one),Purchasing Review, andEngineering Review. Yours may differ. States are maintained in Data Maintenance, and setting them up is Set up a workflow.
-
Get the quote review-ready
- Open the quote and make sure its lines are complete enough to review. A reviewer cannot cost a line that has no part or no quantity.
- Review saved cost, selling price and dates. Use
Quoting Tools > Repriceonly when you intend to replace pricing with current rules, then re-check prices and dates before review. See Quote a job for repricing effects. - Check the dates are still achievable against lead time.
Quoting Tools > Adjust Datesrecalculates them from each line's lead time. It reloads the quote with no message, so read the dates afterwards. - On a Build line, confirm the BOM Worksheet icon is present so Engineering can cost it from the quote itself. That is Cost a custom build. The icon appears once the line's trans code is
Build. - Add a note to the quote explaining what you want from the reviewer, if it is not obvious from the lines. Click
Notesin the left-hand menu of the classic quote screens (Utilities > Noteson the new quote screens). - Run the checks that stop a quote converting, in Quote a job under Check it can convert: credit, Bill To, part numbers, sellable parts, and dates. None of them block the handoff, but a quote that passes review can still be blocked at commit (Turn a quote into an order), and you will be sending it round again.
-
Move it to the next stage
- Click the workflow control in the top right of the quote screen to expand it. The same control appears at the top of the quote's BOM Worksheet, so Engineering can move the quote on without leaving the worksheet (Cost a custom build).
- Read the current state, who it is assigned to, and how long it has been there.
- Under the
Move Toheading, find the button for the stage you want. Each is named for its stage:To Purchasing Reviewon the classic screen,Purchasing Reviewon the React one. Only the moves you are allowed to make appear. A stage can be missing because the current state is not allowed to move to it, because the stage can only be reached from one particular earlier stage, or because the stage is limited to roles you do not have. Each of those is set on the stage in Data Maintenance. - Pick the person from the assignee dropdown next to that button.
- Add
Assignment Commentsexplaining what you need, and CC anyone else who should see the notification. The control has aCC Listand aPriorityon both screens. On the React screen the comments box readsAssignment Comments (if changing). - If you have permission to set workflow due dates, set the due date so the reviewer knows when you need the quote back. Cetec emails them a calendar invite for it. Once a due date is set, the control glows green, and turns red when the date has passed. The redesigned Quote List shows a
Workflow Due Datecolumn to track them. - Click that stage's button to make the move. Leave
Close Workflowalone. It ends the workflow on this quote.
-
See where it is sitting
- Expand the workflow control on the quote to see the current state, the assignee, and the time in stage. Where an escalation threshold is set on a stage, the control shows it alongside the time in stage. Watch that number if a quote has gone quiet.
- To track several quotes at once, use the quote report and read the
Workflow Stage,Assigned To, andTime in Stagecolumns.Sales > Quotes > My Quotes. The Quote List calls the stage columnStage. - For quotes owned by other people, use the fuller report and filter by
StageorAssigned To.Sales > Quotes > Quote List
-
Reassign or send it back
- To hand the quote to a different person without changing stage, expand the workflow control on the quote and use
(Reassign, Keep {state})and pick the new assignee. - To send it back for more work, use the
Move Tobutton for the earlier stage. Same mechanism, the other direction. - Record why in
Assignment Comments. A bounced quote with no explanation comes straight back. - Where Engineering has changed costs, expect the quote's resale to have moved. Re-check pricing before sending it on.
- To hand the quote to a different person without changing stage, expand the workflow control on the quote and use
-
Get it to an approved state
- In the workflow control on the quote, move it into the final state your business treats as approved. If no stage looks like an approval, ask your admin. Cetec ships none (see Who needs to review this), and setting up stages is Set up a workflow.
- If your instance has the Quote - Require Approval Workflow State config on, that state must be named exactly
Approved. - Hand it back to the quote owner to send (Quote a job) or to commit (Turn a quote into an order).