Cost a custom build
Build up material, labor, and markup on a quote line so the price reflects what the job actually costs.Updated Nov 5 2026
This job sits inside quoting. Sales raises the quote (Quote a job) and may route it to Engineering (Get a quote approved). This is what Engineering does with a Build line when it arrives.
Who this is for
Engineers and estimators cost the Build line. Sales reps rely on the result to set the price.
Applies to
Why it matters: the price is only as good as the cost behind it. A subassembly left uncosted or a markup entered as margin means the job loses money, and a slip on the worksheet can overwrite the master BOM that production builds from.
-
What you are costing
- Establish which quote line needs costing, and at what quantity. Material cost per unit moves with volume, so cost at the quantity being quoted.
- Decide whether the assembly already has a permanent BOM to start from, or whether you are building the structure from scratch for this quote. The permanent BOM on the part revision is the master. The BOM worksheet on the quote line is a working copy that belongs to this quote alone. Costing happens on the worksheet, so nothing you do here touches the master until you deliberately push it.
- Check whether any component is itself a subassembly. Each one gets its own nested worksheet and its own cost roll-up.
- Check that no other line on the quote has the same part and revision. If one must stay as it is, quote it on a separate quote.
-
Open the BOM worksheet
- Open the quote and find the line for the assembly.
- Confirm the line's trans code is
Build. Click the pencil icon, setTrans CodetoBuild, and clickOK. - Click the BOM Worksheet icon on the line, the document-list icon. It appears only once the line is a Build line, so if you cannot see it, check the trans code first.
- The worksheet opens on its new screen.
Use Old Version/Use New Versionat the top switches between the two. If the new screen shows Failed to fetch BOMQuote Header, use the old version.
-
Add the components
- On the line's BOM worksheet, first check the components already copied in.
- For a missing component, enter its prcpart (product code plus part number) in the empty row at the bottom, set
Qtyto the number needed per finished assembly, and clickAddat the end of that row. Cetec accepts a prcpart with no part record, without a warning, so check the spelling. Repeat for each missing component. - Set each component's cost directly in the grid. There is one cost column per quote quantity, headed
Cost, <qty>(for exampleCost, 10,Cost, 25). Each cell saves when you tab out of it. Check the value stayed before moving on. - To pull an existing structure in rather than typing it, use the left-hand menu.
Copy BOMpulls from the permanent BOM record,Copy BOM Wkshtcopies another quote's worksheet, andImport BOMbrings components in from a file. IfCopy BOM Wkshtcannot find the worksheet you named, Cetec says so. If it fails for any other reason, it shows no message at all, so check the components actually appeared. - For a subassembly component, click into its own nested BOM Worksheet and cost it the same way.
- Click
Updateto save.
-
Add labor and tooling
- On the BOM worksheet, click
Editnext to theLabor Totalrow. - The labor screen (LABOR FOR QUOTE {n}) opens in a new browser tab. Choose a work location in
(add location)and clickAdd. - Open that location's operations, pick one in
Add Operation:and clickAdd, then set itsTimesto match how the job will actually run and clickSet. - Leave the
UpdateunderTOTAL LABOR ESTIMATEon the labor screen alone for quote costing. It sets an estimate for every revision of the part. - Close the labor tab. On the BOM worksheet,
Labor Totalshows the minutes and cost. - Add tooling with
Editnext toTooling Total:Tooling Cost,Tooling Comment,Apply Cost:, thenOK.+/- Toolingshows or hides the tooling rows once there are some. These pop-ups need a wide window. On a narrow oneEditmay do nothing. - For tooling, excess material and the
Material Procurement Percentage, choose how each reaches the quote underApply Cost:Ignore Cost,Roll Up on BOMto fold it into the line's cost, orAdd Line Itemto put it on a line of its own. - For charges that apply every time a part is built, such as setup fees, tooling or testing, set them once on the part record instead:
Chargesin the part's left-hand menu. They are copied into the worksheet whenever it takes its components from the part's BOM: when it is created, and onRefresh BOMorCopy BOM. They show under the misc charges total.
- On the BOM worksheet, click
-
Check the subassemblies rolled up
- On a multi-level assembly, open each subassembly's worksheet from the bottom up.
- Check its components and labor are costed, then click
Transfer to Parentto write its cost into its row on the assembly above. - Open the top-level worksheet again and check each subassembly row now carries the cost from its worksheet.
- If your instance sets the BOM Quote Sub Assembly Cost Source config to
1, subassembly rows always take the part's cost breaks, andTransfer to Parentchanges nothing.
-
Apply markup or margin
- On the top-level BOM worksheet, click
Editnext to theMarkup Totalrow. - Enter the unit selling price in
Resale, or use a percentage expression:30%calculates a 30% margin and30%mcalculates a 30% markup. A plain dollar value is the selling price. - Read the formula the window shows for each quantity. Tooling, procurement and excess material ticked
Tooling After,Procurement AfterorExcess Afterin the markup window are added after the margin or markup, not marked up. - Click
OKto save it on the worksheet, orOK and Transfer to Quoteto save and send the result to the quote line in one action.
- On the top-level BOM worksheet, click
-
Send the cost to the quote
- On the top-level BOM worksheet, click
Transfer to Quoteto send the costed figure to the quote line. The transfer costs every quantity break on the line, not just the primary one, and sets the line's cost from the primary break. It raises each break's lead time to the longest component or tooling lead time when that is longer. SG&A on the worksheet does not transfer. - Open the quote and confirm the line now carries the costed figure. Hover the line's cost to see what it includes, for example Tooling Cost Included (rollup). After the transfer the line's cost is locked on the quote. To change it, change the worksheet and transfer again.
- If the top-level part is set to pull resale from its subassemblies, a Part Build Defaults setting, the transfer also rolls up resale. The worksheet says so beside
Transfer to Quote. - On the worksheet, tick
Order/Temp BOM Only?when the component changes are for this order only. The components then go to the order's own BOM and the master's components are left alone. Your admin can make the box ticked by default. - To write the worksheet to the permanent record now rather than at conversion, click
Commit BOM. It also adds uncommitted Cust Parts to their parts for this customer.
- On the top-level BOM worksheet, click
-
Move the quote on
- Costing usually reaches you through the quote's review. When the cost is on the line, move the quote to the next stage from the workflow control at the top of the worksheet or the quote. See Get a quote approved.
- If the quote came straight from the rep instead, tell them the line is costed.
- When the customer pushes back on price, the quote comes back to you the same
way. The line's cost stays locked on the quote, so re-cost it on the worksheet
and click
Transfer to Quoteagain.