Skip to main content
Try for free

How To Clone Parts

Use Clone on a part record to create a new part number that starts as a copy of an existing part, including its revisions, BOM and labor plan.

Updated Nov 9 2026

How To Clone Parts

Allow external media cookies to watch this video.

Before you start

  • Clone is in the part's left menu under MAINT, which only shows to users with the Can Edit Part function (Manager, Purchasing, Supervisor, Part Edit, Can Edit BOM or Sales by default; the Block Edit Part role takes it away). Admins always see it.
  • The new part number must start with a PRC that exists in Cetec (its first three characters) and must not already be in use. Cetec upper-cases it and strips spaces at either end and non-English characters.
  1. Open the part to copy

    1. Go to Parts > Lists > Part List (the page is headed Parts).
    2. Click the filter search bar (Filter or search…), choose Prcpart, type the part number (PRC included), pick the part you want to copy from the suggestions, and click Apply (1).
    3. Click the part number in the PrcPart column. The part record opens.
  2. Clone it to a new part number

    1. On the part record, open MAINT in the left menu and click Clone.
    2. Under Clone To New Part, type the new part number (PRC included) in the box that shows (new prcpart number).
    3. Click Clone. Cetec opens the new part's record. (A Successfully Cloned message may flash before the page changes; the new record opening is your confirmation.)
  3. Check what was copied

    1. On the new part's record (Cetec opens it after the clone), check Edit, Revisions and, for a BOM, BOM DATA > BOM Overview.
    2. The clone copies:
      • the part's settings (description, flags, custom fields) with today's date as the created date and you as the creator,
      • every revision, with its BOM components and its labor plan (work locations and operations),
      • the BOM header,
      • the warehouse settings for each location (description, UOM, reorder point, MOQ, standard pack, default cost and resale and similar),
      • pricing rules, cost and resale price breaks, BOM quote charges and tech descriptions.
    3. It does not copy stock on hand, documents, notes, crosses or any order, quote or PO history. Change anything that should differ on the new part's Edit screen.