Skip to main content
Try for free

Turn a quote into an order

Commit an approved quote so it becomes a live order that production and accounting can act on.

Updated Nov 5 2026

Everything production, purchasing, and accounting do later depends on the order this job creates. Every order in Cetec comes from a quote. Create > Start Quote/Order makes a Quote / Order Worksheet, which is an ordinary quote, and sales order imports, kits, and projects all create their orders from a quote too.

Who this is for

Sales reps and order-entry staff commit the quote. Production planners, buyers, and accounting work from what it creates.

Applies to
Sales
Production
Accounting

Why it matters: the order is what every other department acts on. The work orders, the purchasing, and the invoice all come from it. A wrong trans code, a subassembly set the wrong way, or a line committed by mistake becomes the wrong thing built, bought, or billed.

Before you start

Use a quote the customer has accepted, with saved lines, prices, and dates, and your company's required approval. If you are still entering the quote, finish Quote a job first. For practice, use a training quote in your test environment. Commit Order creates live order records. Finishing the tutorial alone does not create an order.

  1. What kind of order this becomes

    1. Confirm the trans code on each line is what you want built. Stock ships from inventory, Build creates a work order, and Charge bills money with no inventory effect. The lines table has no trans code column. Open each line with its pencil (Edit Line, which opens ADVANCED EDIT on the React quote) and read Trans Code.
    2. Check whether the customer is internal or external. Open the customer from the quote header and read Intercompany (Yes is internal). An order against an intercompany customer is a build-to-stock work order. Against an external customer it is a sales order. The difference shows at the very end: an external order's menu reads Invoice/Ship and its column reads Ship Qty, and an internal one reads Complete/Receive and Finish Qty, so there is no "Invoice" on an intercompany order.
    3. Check Order Type in the quote header (click More Options to show it): Scheduled, Unscheduled, Drop Ship, or Blind Ship. To change it, use the header's pencil icon, then click OK (Submit on the React quote).
  2. Find the approved quote

    1. Open the quote you are converting. Sales > Quotes > Quote List
    2. Confirm it is in the workflow state your business requires before commit. See Get a quote approved.
    3. Click Commit To Order in the left-hand menu. There is no equivalent control in the quote header. The button on the screen it opens is named Commit Order, so the different name does not mean you are on the wrong screen.
  3. Read the blockers before you commit

    1. On the quote's Commit To Order screen, wait for validation to finish, then read any Order Entry Prohibited Until All Conditions Are Met list displayed. It may be absent when there are no blockers. Anything listed here is a hard block. Commit Order stays disabled until the checks finish, and while there are blockers the React screen shows no Commit Order button at all. The list's footer links back to the quote with Please Edit Quote and Fix All Issues, where Edit Quote is the link (the classic screen capitalises And). The fixes happen on the quote, not on this screen.
    2. Read any Order Notices (Doesn't Prohibit Order Entry) box displayed. Click its arrow to expand the notices. These are warnings. They will not stop you, but most of them catch a real mistake.
    3. Read these notices rather than clicking past them: PO Has Already Been Used By This Customer!, Part X Hasn't Been Ordered By This Customer Before!, Line N has a date set more than a year in the future!, Line N Ship Date should be {date} based on Customer Ship Ahead Days (N), lines where Ship Date and Dock Date are the same, lines where Ship Date is before Dock Date, and Multiple Locations Set On Quote Lines! Separate orders will be created for each location. That last one changes how many orders you end up with.
    4. Check for Note: Parts on this Quote have open ECOs. It lists each open ECO against a part on the quote, with a link. An order committed now builds the current revision. See Change a design.

    Hard blockers, by what they are about:

    Quote stateQuote Is Not Open, Quote Has No Open Lines, Quote Hasn't Been Approved, One or more BOM Worksheets are still loading. Please wait, reload this screen, and try again.

    CustomerCustomer Is Not Defined, Customer Billto Is Not Defined, Customer Is Not Active!, Customer is on credit hold, Restricted Order Entry for credit code ({code}), Quote Contact Field is Required

    Parts and revisionsYou must have a prcpart for all Quote Lines before you can convert to an order, Line N includes a Part that is Not Sellable., <prcpart> Revision <rev> Is Set To <status> And Can Not Be Built!, Line N Revision no longer exists, PRC <prc> does not exist for lineitem(s), Kit is already on Open Order (Order …)

    Header fieldsFields Required: Ship Via, and the same list naming Ship To, Order Type, or Line N has a quantity of 0!. For an external customer a missing Ship Via or Ship To always blocks the commit, whatever your configs. Imported quotes are the usual cause. Set them in the quote header, as in Quote a job.

    Lines and locationsDuplicate Quote Line Numbers Found (Line #: …), Location Required For All Lines, Only Selling Locations For All Lines, and, only when the Enforce Quote Date Validation config is on (otherwise it is a notice), Line N has a date set before today or is blank! Please Check Ship Date, Work Start Date, and Dock Date!

    Money and approvalQuote Requires Cost Center / Lines Missing Cost Center: …, Quote Requires Prepayment Prior To Order, Quote Doesn't Meet Min GM Of X (Y), Approval Required, Quote Doesn't Meet Min Resale Of X, Quote Exceeds Max Resale Of X, User Blocked From Converting To Order!, Part <prcpart> Hasn't Been Ordered By This Customer Before! A Manager Will Need To Convert This Quote To An Order

    Trans code and order typeWH Transfer Lines Must Be Set to 'Stock', Intercompany Customer Required For WH Transfer, Warehouse Transfers can't be set to Order Type 'Drop Ship', Field Mismatch; Drop/Blind Ship Transaction Code must be set to Charge for line N

  4. Fix what blocks it

    1. On the Commit To Order screen, read the specific message in the prohibited box. It names the line or the field.
    2. If the message is One or more BOM Worksheets are still loading, wait, reload the screen, and try again. It is the one blocker that clears itself.
    3. Otherwise open the quote itself (the blocker box links to it) and fix it there. Most blockers are quote-level or customer-level, not commit-screen-level.
    4. For a margin block, adjust the pricing or get an Admin or Manager to convert the quote. For them, Quote Doesn't Meet Min GM appears as a notice they can override.
    5. For an approval-state block, move the quote into the required state. That is Get a quote approved.
    6. For a prepayment block, take the prepayment first. That is Take a prepayment.
    7. For a credit hold block, Accounting can clear the hold (Set credit terms), or a user with the Can Manage Customer Credit Hold permission can tick Ignore Credit Hold on the quote header, with a note saying why. That lets this one quote commit. It does not clear Restricted Order Entry for credit code. That comes from the customer's credit code itself, and only Accounting changing the code clears it.
    8. Return to Commit To Order and re-read the box. It recalculates each time you open the screen.
  5. Set subassemblies and order type

    1. On the Commit To Order screen, in the lines table, untick any line that should not be ordered yet. Every line is ticked to start with, and Check/Uncheck All Lines flips them all. Only ticked lines are checked for blockers and committed.
    2. Where the quote has subassemblies, find the Sub-Assembly Orders and Internal POs to be Created (N) section. It appears only for a multi-level quote. Check its grid: Quote Line, Prcpart, Quantity, Rev, Prod Line, Location, Customer, Work Start Date, Ship Date, Dock Date, Vendor, PO Location.
    3. Set the Build? dropdown on each subassembly. Yes generates a separate work order and an internal PO, a sub-order you can schedule, pick, and track separately. No does not build it. The finished sub pulls from stock and no sub-BOM is created. With Top builds it as a phantom alongside the top-level order.
    4. To set them all at once, use the (set default build/buy) dropdown at the bottom of that table, or (set based on available qty) to let Cetec decide per sub from what is actually on the shelf.
    5. To add up the quantities of subassembly rows for the same revision into one sub-order, click Combine SubOrders with Same Rev below the subassembly table. It uses the revisions from the BOM Worksheet, not any Rev you changed on this screen. Refresh the page before committing if you change your mind.
    6. Tick Create Separate Order For Each Quote Line? if the lines need to be separate orders.
    7. On a drop ship quote, choose the vendor in the Drop Ship Order section. It appears only when the quote's Order Type is Drop Ship.
    8. For an intercompany customer or a warehouse transfer, set the Receiving Location and In Transit Location. They appear only for those quotes.
  6. Commit the order

    1. On the Commit To Order screen, wait for validation to finish and confirm there are no hard blockers. The button reads Commit Order (pending load) while the screen is still calculating.
    2. Check Do this in the background? beside the button. It appears unless your instance has switched it off, and it is ticked for you, in red, when more lines are ticked than your instance's threshold (100 unless changed). Cetec then creates the order in the background and notifies and emails you when it is done.
    3. Tick Put all lines into batch? only to put the new work order lines into one production batch. Every ticked line must be at the same location, or Cetec refuses and lists the lines that differ.
    4. Click Commit Order once after checking the selected lines and order settings.
    5. Do not click a second time. While the order is being created the button reads Commit Order (already backgrounded!).
  7. Hand it to production and accounting

    1. Cetec opens the new order with Success: Created Order {number}. Note the number. It may open in an order workflow state such as Pending Approval. That is your company's order review, not a failed commit, and it moves like the quote workflow in Get a quote approved. If you chose a background commit, wait for the completion notification before treating the order as created.
    2. Verify the order's customer, part, revision, trans code, quantity, cost, selling price, and dates against the accepted quote or PO. The order's lines table does not show revision, ship, or dock date by default, so open the line to check them.
    3. Open the work order for a Build line to check it landed as expected. Workorder View > Line {n}
    4. Where subassemblies were set to Yes, check the Sub Order {number} links near the bottom of the left-hand menu. Phantom subassemblies committed With Top produce no sub-order and will not appear in that list. That is expected, not a failed commit.
    5. Close any lines you unticked that are lost, with a resolution (Review win/loss). Committing closes each ordered quote line and records its order number, but the quote itself closes only when no open lines are left, so unticked lines stay open on the quote. Cetec also re-checks the customer's credit hold after the commit.
    6. Send the customer their acknowledgement. That is Confirm the order with the customer.

Other ways to do this

Enter an order from a customer PO

The customer has sent a purchase order for something nobody quoted in Cetec. You still go through a quote, because Cetec has no separate order-entry screen, and apply your company's review requirements. You do not need to send a sales quote when the customer has already supplied an accepted PO.

  1. Click Create > Start Quote/Order in the header, search for the customer in Select Customer, and click Create. Pick the customer before you click Create. Without one, Cetec still makes the quote, with no customer on it, and you must set the customer on the quote before anything else. Cetec opens a new quote and says Quote / Order Worksheet Created.
  2. Enter the Cust PO # and the lines from the PO, exactly as when building a quote. See Open the quote and Build the quote lines in Quote a job.
  3. Continue at Read the blockers before you commit. You can skip Find the approved quote: you are already on it.