Skip to main content
Try for free

Define a BOM

Define what a product is made of.

Updated Nov 5 2026

Who this is for

Engineers define what each assembly is made of. Buyers, production planners and the warehouse work from the result: it is what gets bought, picked and built for every order of that product.

Applies to
Engineering

Why it matters: the BOM drives material cost on quotes, what purchasing orders, and what the shop picks. A missing component or a wrong quantity per unit means shortages on the floor or a cost that never matched the price.

  1. What the product is made of

    1. List the components and how many of each go into one unit.
    2. Mark which components are themselves assemblies. Each one needs its own BOM, defined before the product that uses it. Cetec refuses a component it cannot find as a part, so build a multi-level BOM from the bottom up: the lowest sub-assembly first, the finished product last.
    3. Check every component exists as an active part in Cetec. Set up missing parts with Set up a part before adding them.
    4. Check the units: a quantity is in the component's stock UOM, per one finished assembly. For example, two screws per assembly is Qty Per Top = 2; an order for ten assemblies needs twenty screws before scrap allowances.
  2. Create the BOM part

    1. Open Parts > Lists > Part List and click Create Part (Create New on the older list).
    2. Pick the PRC, type the Part number, check the Location, and add a Part Description. The PRC is the three-letter product code the part belongs to. Many companies keep one, such as BOM, for assemblies.
    3. Tick BOM?, and give the first revision a name in Revision if you want one (for example A).
    4. Click Create. Cetec opens the new revision's Edit Revision BOM. Check the part number and revision at the top before adding components.
    5. Open the part's Edit profile and check its stock UOM before the part is quoted or stocked. A new part may have no UOM until you set one. Save with Update.
    6. Return to this revision's Edit BOM: open the part, click Revisions, and click Edit BOM on the revision's row. Use the same path whenever you come back to the BOM later.
  3. Add the components

    1. On the revision's Edit Revision BOM screen, in the Add new component row below the list, enter the component's part number under Prcpart and its Qty Per Top — how many go into one unit — plus Work Loc or Reference Designator if you use them. Leave Comp # at 0 and Cetec numbers the lines for you.
    2. Click Add on the newer editor. Check that the component appears as a saved row before adding the next one. The classic editor adds its footer row when you click Update.
    3. Fill in any other columns you need on the added rows — Scrap Factor, Scrap Adder, Comments, Pick Comments, Sourcing — and click Update. The table is wider than the screen: scroll it to the right to reach Qty Per Top, the later columns, and the Update button at its bottom right.
    4. Enter scrap the way Cetec reads it. Scrap Factor grows with the quantity: 5 means five extra per assembly, so two per assembly with a scrap factor of 5 needs seven; 5% means five percent extra. Scrap Adder is a fixed extra for the whole build. Both start from the component part's defaults, set on its profile.
    5. Check that the saved quantities and reference designators match your drawing; typing into a row does not save it until you click Update.
    6. To pin a sub-assembly to one of its revisions, set the line's Revision. Otherwise it always uses the sub-assembly's current revision.
    7. To remove a line, click the red ✖ under Info/Delete on its row — the row highlights — then click Delete at the bottom right of the table and confirm.
  4. Check the BOM

    1. Open the part and click BOM DATA > BOM Overview.
    2. Confirm which revision the overview is showing — it says BOM Overview for Current Revision above the list. Check the structure level by level in the component tree at the top; Expand / Collapse Tree opens every level (Show/Hide Tree View of BOM on the older screen).
    3. Read any warning about components with no part record, and fix them.
    4. Enter a Build Qty and click Set to see what the whole BOM costs at that quantity. Compare the extended quantities with your expected build.
    5. Say which material cost you mean when you hand a cost to Sales. The BOM Overview's material cost can differ from Material Cost at the foot of Edit Revision BOM. The editor uses each component's own cost; the Overview rolls sub-assembly costs up from their BOMs, shown in its Rollup column.
    6. To follow quantities through the levels, use BOM DATA > Build w/ Subs, which walks the build quantities down through the sub-assemblies. BOM DATA > BOM Use (n) lists every BOM a part is on. The older screen hides BOM Use on a part no BOM uses.
    7. Attach drawings to the revision, not the part, when they belong to one revision: open the revision and use its Documents menu item. Documents attached to the part are not tied to any revision.
    8. Before handing off to quoting or production, check the component list, units, quantities, sub-assembly revisions and drawings together. Saving a BOM does not mean the design has been approved for release.
    9. Define how the product is built — work locations, operations and times — with Define a routing. To change a released BOM in a controlled way, use Change a design.

Other ways to do this

Turn an existing part into a BOM

The part already exists in Cetec.

  1. Open the part and click Edit.
  2. Click Create As BOM in General Information.
  3. Continue at Add the components.

Start from another BOM

  1. On the revision's Edit Revision BOM, click Show Copy from BOM/Rev.
  2. Choose the BOM and revision, and click Overwrite/Copy. It replaces every component already on this revision, so use it before you add your own, not after.

Add many components at once

  1. To paste a list, click Show Batch Component Add on Edit Revision BOM and paste the components in.
  2. To load components from a spreadsheet, use IMPORT BOM in the revision's left-hand menu.